Solar For Commercial Use

Cyprus companies can make use of solar energy to drastically reduce their electricity bills through the SELF-PRODUCE scheme.

The scheme allows for all electricity produced, during sun hours, through a PV solar installation to be diverted to the company’s electrical meter therefore reducing the import of electricity from the grid.

REQUIRED STAGES:

  1. An initial analysis of the annual electricity consumption.
  2. A survey to establish the available space for the installation of PV panels.
  3. An initial indication of the size of installation that can be achieved and its cost.
  4. We proceed to detailed studies for submission of applications to CERA(construction & operation) and the EAC (terms for connection).
  5. Licenses for the installation are normally issued within 6 months from application date.